path maintenance at the Schneealm: hammering a pole into the ground

hammering a pole with marking into the ground

are you aware of all the work that has to be done to ensure safe paths in the mountains? do you know how much time has to be dedicated to refreshing markers and mounting signposts? are you informed about the people who take care of handrails alongside steep paths? well, i wasn’t, at least up until the first weekend of july 2016!

after years of splitboard touring, hiking, freeriding and some (easy) climbing in the alps, i decided it was time to give something back to the volunteers who generously donate their free time to ensure safe paths in the mountains for everyone to use free of cost.

in may, after getting inspired by an article about path maintenance, i contacted the Alpenverein to ask about possibilities to help out. i quickly got a reply, offering the chance of joining a team which takes care of the paths on and around the Schneealm in Styria. this sounded like a great opportunity to me – to be taken under the wings of experienced people, getting initiated into the vast field of knowhow around path maintenance.

although the weather was forecasted to be a bit capricious, i set out for Altenberg an der Rax in the morning of the 2nd of july 2016. i arrived at 10pm and met up with Otto from the Gebirgsverein Südwien-Mürzer-Oberland. after a short stop at my accomodation, the Lurgbauer-Villa, we quickly began our drive up the Schneealpe.

our first tasks were improving the mounting and cleaning some signs. we then moved on to the Kutatschhütte, which is a small shelter on the Schneealm. to ensure a welcoming hut experience for all visitors, we cleaned up a little, sweeping the floor, emptying the trash can and folding the blankets.

path maintenance at the Schneealm: sweeping the floor of the Kutatschhütte

sweeping the floor of the Kutatschhütte

then we continued our trip across the Schneealm plateau, stopping every few meters to either rectify existing posts with marking or to hammer new posts into the earth, to allow for good orientation even on foggy days. every post needs a bit of barbed wire wrapped around it to keep the cows which graze on the mountain pasture from playing with the posts. they love a good scratch just too much!

after a short break in one of the huts, we continued our work and repainted the letters on some signs. they get worn out by the weather so much that they need a bit of refreshment now and then.

path maintenance at the Schneealm: Otto repainting a sign

Otto repainting a sign

later on, we drove back down towards the valley and stopped at the Knappensteig. we ascended a short bit, carrying a cordless screwdriver and a cordless brushcutter to the path. we enhanced the mounting of a sign and then proceeded to mow the grass covering the path. since a lot of people like to use this path for trailrunning, we made sure to uncover the path as good as possible.

at 5pm, just before the thunderstorm, we ended our work day and i headed back to the Lurgbauer-Villa for a very relaxing night of sleep.

 

on sunday, the weather was not too friendly – grey clouds and rain greeted me in the morning. still, we had work to do and met up at 10am. this time, we were 4 people in total, since we were joined by Peter and Nikos.

we packed all of the needed equipment into the all-terrain car and drove up to the Nasskamm. at the end of the road, we noticed that a handrail had been partially destroyed, probably by an avalanche in late spring.
our first task for the day was found!

path maintenance at the Schneealm: picture of a handrail, that was broken and has been repaired by us

the handrail, before and after

we searched for the missing parts of the handrail and tried to figure out how they could possibly fit together. after getting a general idea of the situation, we started with pulling up one of the longer logs with assistance of a rope to the path over the steep slope. we hammered a shorter pole into the ground and Peter used the chainsaw to even out the ends of the longer log, so that they formed a flat surface to lie upon the tops of the vertical poles. after using long nails to fix the log, the first part of the handrail had been restored successfully.

the rain got more intense and we had to use a hoe a few times to chop steps into the steep, slippery path between working on the handrail. after about 2 hours, we were done with repairing the handrail.

luckily, the weather had gotten better again, so we grabbed spar varnish in red and white, a sledge hammer as well as a chainsaw and started a 20 minute hike upwards to a meadow. orientation in the fog would be a problem here, since the marking on the trees had already faded out too much and the posts with marking were too far away from each other. so we started enhancing the situation. Nikos and Peter added posts and cut away some branches to reveal the paint marking, Otto and I refreshed the spar varnish on the trees.

path maintenance at the Schneealm: Nikos is mowing the lawn in the mountains

Nikos mowing the lawn in the mountains😉

path maintenance at the Schneealm: using a brushcutter to uncover poles with marking

uncovering poles with a brushcutter

after this, we took a short break and then proceeded to the last place of action of the day, a path further down the mountain. we followed the path by foot, added posts with marking and cut away the grass around all posts.

when we reached the car again, we packed all equipment into the trunk and headed back down to the valley, where we ended the day at the Altenbergerhof.

 

although I was tired after two days of work, I was very happy that I decided to take part in this project! especially the hard work on sunday was great, because you could see the results directly afterwards. I was able to learn a lot and I was not aware of all the work that needs to be put into maintaining a safe network of paths.

my goal is to keep participating in these missions to learn enough so that I can contribute on my own in an area near to my home one day.

 

-> info on path maintenance and volunteering at the Alpenverein website

-> German version of the article on powderguide.com

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s